Lee's Summit, MO — 816-525-7000
Lois Spargur
Cell: 816-509-2306
NEW CONSTRUCTION — READY TO BUILD | ESTIMATED COMPLETION DECEMBER 2026 Here is your opportunity to make a new home your own before construction begins!
$417,400
#gpc2635761 — Residential
900 Charles Street
Knob Noster, MO 65336 (Johnson County)
Knob Noster School District
Located at 900 Charles Street in Knob Noster, Mo 65336 this thoughtfully designed 4-bedroom, 3-bath split-level home will offer quality finishes, generous living spaces, a covered back deck and an oversized 2-car garage. Contract early for the opportunity to make certain selections and add your personal touch before construction progresses. Built by an experienced local builder with a focus on craftsmanship and attention to detail, the exterior is planned with stone and vinyl siding. A grand front staircase with black metal railings leads to an impressive 8-foot front door. Inside, 9-foot walls on both levels create an open, spacious feel. LVP and carpet flooring are planned throughout. The kitchen will feature custom cabinetry, granite countertops, center island with built-in trash storage, deep sink, disposal and large pantry with pull-out shelving. Refrigerator, stove, microwave and dishwasher are planned to be included. The main level offers 3 bedrooms, including the primary suite with raised ceiling, recessed lighting and ceiling fan. The private bath features a large tiled walk-in shower with glass door, 6-foot double vanity and a walk-in closet with custom-designed storage. The finished lower level adds a large family room, 4th bedroom with walk-in closet and full bath. A mudroom/drop zone with custom bench and coat hooks provides convenient organization near the garage entrance. The oversized 2-car garage will feature double doors with quiet side-mounted openers—a thoughtful feature with bedrooms above the garage. With construction just started, this is a unique opportunity to secure a brand-new home early in the building process and personalize select features along the way. Estimated completion December 2026.

View on Google Maps
Interior Details
- Bedrooms:
- 4
- Total Baths:
- Full: 3
- Heating:
- Heat Pump
- Cooling:
- Heat Pump
Exterior Details
- Roof:
- Composition
- Architecture:
- Traditional
Legal Details
- Date Built:
- 2026
